[ Inscrivez-vous ]
A LA UNE !
08 Septembre 2020
Tripoli, Libya, September 8 (Infosplusgabon) - The supply of drinking water to the Libyan capital, Tripoli, resumed on Tuesday after several days of interruption due to problems with power supply to the water pumping station of the Artificial River Body of the Hassaouna - Sahel al-Jafara system.